Easter Beltie restoration: Week 5

Image by: Andy Kindnessdcim-100media-dji_0064-jpg
dcim-100media-dji_0021-jpg
The weekend’s heavy rain left the whole site underwater. We didn’t know whether our newly-restored channel would have survived.
img_2302
But the flood waters dropped very quickly and we were amazed to see that the site was unharmed. The flows, although high, had moved slowly through the site, with the wetlands and new floodplain absorbing most of the power of the storm.
img_2291
The bridge, which was almost swamped, has emerged unscathed.
img_2328
The wetlands remained very wet, with the water table up at winter levels. This meant a lot of water to pump and the site was shut down while the ground dried out.
img_2321
The ground was far too wet to continue with excavations and most of the week was spent draining the site.
img_2315
Our silt traps were overwhelmed, but in floods of this size there is erosion across the catchment. causing waters everywhere to be muddied for a time.
img_2312
We have decided to leave the bottom of the bypass channel open (although it will be left to vegetate over) so that there is a safety valve for really high-flow events.
img_1991
Despite the set back of the floods we had a lot to be pleased about – the design had stood the test of extreme conditions and was working just as we’d hoped, we were able to make some progress, and we had the good news that we will be seeing the project on BBC Landward this week (Thursday 15th, 8pm).

Linked projects:

Easter Beltie restoration

This large-scale river valley restoration is returning a straightened agricultural stream to a natural meaning course, running through extensive wetlands…

More