Easter Beltie restoration: Week 2

Image by: Susan Cooksleydsc_0340crop

img_1463
The Beltie Burn was diverted to a bypass channel. This is a temporary diversion for the next week or two.
img_1547
The bypass channel is very flat and looks like a canal. The channel is thickly vegetated further down, and this combined with our silt traps works to keep the water leaving the site clean.
img_1412
A temporary bridge was built over the new bypass channel.
img_1488
The water in the old channel is now quite muddy so silt traps have been placed to prevent any soil entering the burn. There will be some eroded soil but we are doing our best to minimise this.
img_1477
The bottom end of the bypass channel was lined to prevent erosion of soil into the burn.
img_1510
The water flowing out of the bypass channel is crystal clear.
img_1545
Our designers from cbec eco engineering spent a day setting out the exact levels for the channel and the twists and turns of the edges of the wetland.
img_1528
On such a flat site it is absolutely critical to get the levels right so that the water flows as planned.
img_1591
There is a simple system for working out how deep to dig the channel. It’s all marked out on the fencing.
img_1486
Work has begun on the downstream end of the new channel. It’s 3.7m at the deepest point.
img_1604
The excavation of the new channel started at the bottom of the site and will continue upstream – there will be no going back so it’s essential to get it right first time.
img_1585
All the machines have been busy working on the lower channel to make the most of the favourable weather.
img_1572
The slopes of the banks have been carefully designed to blend into the lie of the land, and meet the mature ash trees at the correct height.
img_1577
We showed the chairman of the Dee District Salmon Fishery Board Lawrence Ross, and River Director Lorraine Hawkins round the site on Thursday.
img_1619
James Shooter of Scotland the Big Picture came to take fantastic drone footage which gives a stunning overview of the site.
img_1560
The whole area was once a wetland and is clearly ready to revert to this. We have seen small flocks of snipe using the wetter ground.