Water Resources

dscf1257-9683057
Water quality | Water Resources | Development & Engineering | Habitats | Species | Access and Recreation | Sub Catchments

The climate crisis has moved to the top of the political agenda and there is a much wider understanding of the need to build a more resilient river system.

The Water Resources section of the Dee Catchment Management Plan (CMP) addresses issues that affect how much water is in the river system. The focus is on floods and droughts and how to reduce their severity, now and in future. Our projects concern the way land is managed to improve how effectively it is held in the landscape.

In the 15 years since the Dee CMP was published, Deeside has experienced extremes of flow many times. Both extreme flooding and severe droughts have been devastating for communities and businesses, and it is well understood that this pattern looks set to continue. The climate crisis has moved to the top of the political agenda and there is greater agreement around the need to build a more resilient river system, but how to do this needs further understanding. We have delivered projects that reduce runoff, improve water storage and build resilience throughout the catchment, from peatland restoration and reforestation in the headwaters, to river restoration and flood storage in Aberdeen City. Much of this work was delivered through three EU projects that brought substantial investment in climate measures: Pearls in Peril, Aquarius and BEGIN.

Our achievements

cars-start-4803108
The re-connecting of the Mar Lodge floodplain by removing the ‘Car bank’ allows this significant floodplain to store water at lower flows
dsc_7041-2267339
Flood alleviation works at Maidencraig
dscf1256-1640346
Fernielea flooding showcase
dscf1240-8699240
Fernielea flooding showcase

Projects

  • Peatland restoration has taken place across 12 projects, covering a total of 720 hectares.
  • A network of potential flood storage sites in the Tarland catchment have been developed through the EU Aquarius and EU 3 Dee Vision projects.
  • River restoration projects at Mar Lodge, Garbhe Allt and Easter Beltie have reconnected floodplains.
  • City SuDS projects have been implemented at three sites in Aberdeen City (BEGIN).
  • Scottish Water removed the abstraction pressure in Water of Dye and reduced allowable abstraction from the Dee.
flowers-in-rain-west-of-potarch_am
Riverbank flowers west of Potarch

Research activities

  • The Dee District Salmon Fishery Board commissioned a study on the impacts of abstractions on flows during drought conditions.
  • Scottish Water undertook a study to investigate the impact of abstractions in relation to the Water Framework Directive.
  • Several modelling studies have identified where woodland creation will have most effect on reducing runoff, with work by James Hutton Institute, Cairngorms National Park Authority, Scottish Forestry, and Aberdeenshire Council.
ron-mitchell-44208397_10217733116304380_4199812669219274752_n
Atlantic Salmon

Planning, funding and regulation

  • Four of the catchment’s 56 Waterbodies are at Moderate status due to drinking water abstractions. Local Development Plans (Aberdeen City Council, Aberdeenshire Council, Cairngorms National Park Authority) consider the impacts of abstraction.
  • As a responsible authority under the Flood Risk Management Act, Scottish Forestry has investigated ways to target woodland creation to achieve upland retention of water.
  • SRDP – RDC-RP, LMO grants are being awarded to promote best practice. River Dee is a RDC-RP priority area.
  • Aberdeenshire Council’s North East Scotland Flood Risk Management Plan has been published and is implementing actions to reduce flood risk. The five Potentially Vulnerable Areas of Ballater, Aboyne, Banchory and Torphins, Westhill and Aberdeen city, have been identified and are included within the Local Development Plan.
  • Supplementary planning guidance on water resources has been produced to accompany the Local Plan. This is considered in all FGS, FP and EIA applications, flood risk identified in LIS reports.
  • Whole catchment sustainable flood management approaches are being promoted as part of Flood Risk Management work within SEPA.
  • Flood Management Plans are being prepared for settlements as the need is identified. Ballater’s is in preparation, with Aboyne and Tarland to be covered in next cycle, 2022-27. Flood protection schemes only implemented following studies and subject to Scottish Government funding.
flooding-volunteer-clear-up-jan-2016-1623102
Volunteers help to clean up the Ballater riverbank after Storm Frank

Outreach activities

  • We ran a three-year outreach programme to introduce and promote the concept of Natural Flood Management (NFM).
  • To support this campaign we produced a leaflet and education materials, and commissioned flood models to enable hands-on discussions about managing flows.
  • We attended events throughout the catchment, in the north east and the Royal Highland Show.
  • We ran NFM workshops for land managers in the catchment and presented the concept at meetings with farmers and land managers.
  • We ran a wide range of flood-awareness activities in schools in Aberdeen City and at events in the catchment.
dscf1364-4317022
Natural Flood Management workshop

What needs to be done?

  • Establish a thorough understanding of future abstraction requirements/supply under climate projections.
  • Consider retro-fitting surface water management in urban areas.
  • Identify lost wetlands and make feasibility studies for their restoration.
  • Identify and protect wetlands that are vulnerable to drainage or over-abstraction.
  • Implement a strategy for promoting water conservation in the catchment.
  • Promote floodplain storage initiatives as alternative water sources for irrigation for land management purposes.
  • Review implementation of flood risk policy for 2021 Aberdeenshire Local Development Plan.
  • Gather more data on the effectiveness of Natural Flood Management to guide and encourage its use.

Our projects that support Water Resources objectives:

gairn-tree-planting-8614410

Water temperature research

Evaluating the effects of trees on river temperature

les-park-47478065_509062646245904_7010716035414228992_o

River Restoration film

The story of the Beltie Burn restoration

dcp-staff-2279207

Events

Shows, riverwalks, bioblitzes

olympus-digital-camera

Storm Frank survey

LiDAR and aerial photography after Storm Frank

img_0192

Croy removal

Removing in-stream flow deflectors

2005-09-small-burn-kincraigie-e-bank

SHERPA

Informing EU policy on rural land use

lws_1494-9695625

Adding large wood to rivers

Using wood to improve habitats

dsc_0669-reduced

Mob planting trial

Establishing unfenced woodland

beltie-aerial

Easter Beltie restoration

This large-scale river valley restoration is returning a straightened agricultural stream to a natural meaning course, running through extensive wetlands and fully reconnected to its floodplain.

lapwing-on-nest-ian-francis

Tarland Wetlands Group

Restoring farmland wetlands for wildlife, environment and people

dsc_0641-6349298

Summerhill

Designing SuDS into a new housing scheme

dscf0527-7532211

Refresh Project

Trialling different water protection measures under different climate change scenarios in the Dee catchment

Logie Burn re-meander

Returning a burn in the catchment to its former meandering glory

dscf1217-8939343

Flood planning with Fernielea Primary School

Tackling flooding issues with SuDS at a local primary school in the catchment

dsc_7048-2442944

Den of Maidencraig flood scheme

Enhancing a local nature reserve with the addition of BGI

culter-dam-complete-r

Culter dam fish pass

Opening up the Dee for salmon and trout with the Culter Dam Fish Pass

cars-removed-1-3603914

Car bank removal

Removing a 31-year old eyesore and pollutant from the River Dee’s banks

dsc_9617-9247551

Blue-green infrastructure

A new network of blue-green infrastructure sites for Aberdeen

dscf0534-9178872

Aquarius

Farmers as water managers

dscf0527-7532211

3 Dee Vision

Improving water quality, flood protection and biodiversity in three sub-catchments

pip-tree-planting-2544992

Woodland creation

How we are returning trees to the riverbank

bo81-3492207

Natural Flood Management models

Models that show how river systems store water

imgp0948

Pearls in Peril Project

A nationwide project to safeguard important freshwater pearl mussel populations