Over half of the 88 miles of the main stem of the Dee have been structurally engineered

The Dee catchment, especially the main stem, has been modified extensively over the last 250 years. There have been significant changes to the river’s bed and banks in terms of their course and structure. River engineering affects flows and sediments, and promotes erosion and flooding – both locally and downstream. Removing or easing these structures is an essential part of building a catchment that can be resilient to the climate crisis and support the recovery of nature.

A detailed survey identified structures for easing or removal, and many of these were tackled in a number of successful projects detailed below. There is still plenty of work to be done in this area however – to undo the effects of straightening or reinforcing, for example. Removing or remediating all the obstructions on the Dee is estimated to produce 1,364 extra spawning fish in the river.

Our achievements

cars-start-4803108
The re-connecting of the Mar Lodge floodplain by removing the ‘Car bank’ allows this significant floodplain to store water at lower flows
culter-dam-complete-r
The fish pass on the Culter Dam
img_0192
Using hand-winches to remove cross from the Dee
dcim100gopro-2
Dee at Banchory before the croys were removed
dcim100gopro-3
Dee at Banchory after croys were removed

Projects on the ground

  • The impact of engineering works has been removed or reduced at sites throughout the catchment thanks to a range of significant projects.
  • Over thirty obstructions to fish migration have been removed. 76 miles of habitat have been opened up for salmon and sea trout on the River Dee with the completion of a fish pass on the Culter Dam at Peterculter, the largest man-made obstruction on the River Dee. Fish passes are present at Waterton Loch and Loch of Skene.
  • Croys have been removed at 16 sites through the EU LIFE Pearls in Peril project.
  • Re-meandering projects on the Logie Burn and at Easter Beltie have removed channel engineering from 4 km of stream, reconnecting the floodplain and recreating a meandering course.
  • The removal of the car bank at Mar Lodge Estate eliminated a pollution source, reconnected the floodplain at lower flows and removed an eyesore.
  • Soft engineering techniques eg. willow spilling have been developed and demonstration projects undertake .
  • The Upper Dee Riparian Initiative has planted over 250,000 trees, creating 100km of riparian woodland. A range of techniques are used – fencing, enclosures and mob planting.
wheatear_cr
Male wheatear – the only passerine migrant to regularly cross an ocean. They could be stopping right here or heading for Canada!

Research and monitoring

  • River Dee Trust survey of existing barriers in 2007.
  • Main stem audit.
  • Storm Frank survey, LIDAR, photographs, data provision.
chiffchaff-helen-rowe
Chiffchaff

Planning, funding and regulation

  • Regulatory systems to ensure sustainable engineering works take place eg. Planning process , Habitats Regulations, SEPA CAR licence.
  • Local Development plans have policies on SuDS and requirements for Pollution Prevention Plans as part of new development planning.
  • SEPA regulatory process in place for ensuring protection of water quality and quantity.
  • Planning conditions and enforcement help to ensure adherence.
  • Best practice in river engineering works is promoted by all regulatory authorities.
  • The expansion of riparian woodland is promoted by all partners.
blackgrouse1-8_0006
Black grouse showing tail feathers

Raising awareness

  • Sustainable agricultural techniques are widely promoted in our outreach work e.g. using buffer strips along rivers, and a NFM workshop for farmers and land managers.
  • The publicity around projects such as the car bank removal, Easter Beltie restoration, and the Croy removal gave opportunities to promote messages about engineered structures.
dunnocktw
Dunnock

What needs to be done?

  • Remove the remaining obstacles on the Culter catchment to open up the full 125km of river to spawning salmon and sea trout.
  • Review the remaining sites where engineering pressures are significant and prioritise action.
  • Redouble promotion of soft techniques and highlight outdated techniques.

Our projects that support Development and Engineering objectives:

ddsfb-pip-wide-water-margin-tarland

Tarland Burn restoration design

A design for stream and wetland restoration

les-park-47478065_509062646245904_7010716035414228992_o

River Restoration film

The story of the Beltie Burn restoration

dcp-staff-2279207

Events

Shows, riverwalks, bioblitzes

olympus-digital-camera

Storm Frank survey

LiDAR and aerial photography after Storm Frank

img_0192

Croy removal

Removing in-stream flow deflectors

2005-09-small-burn-kincraigie-e-bank

SHERPA

Informing EU policy on rural land use

lws_1494-9695625

Adding large wood to rivers

Using wood to improve habitats

beltie-aerial

Easter Beltie restoration

This large-scale river valley restoration is returning a straightened agricultural stream to a natural meaning course, running through extensive wetlands and fully reconnected to its floodplain.

Logie Burn re-meander

Returning a burn in the catchment to its former meandering glory

culter-dam-complete-r

Culter dam fish pass

Opening up the Dee for salmon and trout with the Culter Dam Fish Pass

ron-mitchell-44208397_10217733116304380_4199812669219274752_n

Conservation of Atlantic salmon in Scotland

EU LIFE Project for salmon conservation and awareness

cars-removed-1-3603914

Car bank removal

Removing a 31-year old eyesore and pollutant from the River Dee’s banks

dscf0534-9178872

Aquarius

Farmers as water managers

imgp0948

Pearls in Peril Project

A nationwide project to safeguard important freshwater pearl mussel populations